Construction Sequence

A Clear Process for a Considered Result

Building an outdoor space is a sequence of decisions and milestones. We help keep the vision in view from the first conversation onward.

Stages of Construction

Start With the Vision

We begin by talking through your outdoor goals, priorities, and the way you want to use the space. This conversation shapes everything that follows.

Design & Engineering

Our team produces a detailed design that integrates pool, spa, landscape, and outdoor-living elements into a single cohesive plan. Structural engineering and permitting documents are prepared at this stage.

Permits & Approvals

We submit all required plans to the local building department and coordinate any HOA approvals on your behalf. Work does not begin until every permit is in hand.

Excavation

The pool shell footprint is marked and excavated to the engineered depth and shape. Soil is removed and the site is prepared for the structural phase.

Steel & Plumbing

A rebar framework is installed to reinforce the shell, and all plumbing lines — returns, drains, and equipment connections — are laid and pressure-tested before concrete is applied.

Gunite Shell

High-strength Gunite is applied over the steel framework to form the permanent pool shell. The concrete is allowed to cure fully before the next phase begins.

Tile, Coping & Decking

Waterline tile, coping stones, and surrounding deck materials are installed. This is where the design details that define the finished look of the pool come together.

Equipment & Finish

Pool equipment — pumps, filters, heaters, and automation systems — is installed and commissioned. The interior finish is applied, the pool is filled, and water chemistry is balanced before your final walkthrough.